SIAG http://klcc.org en Three Major Upgrades Needed For Bend's Sewer System http://klcc.org/post/three-major-upgrades-needed-bends-sewer-system <p>Three major upgrades are needed for Bend's sewer system, and they need to happen soon. That's according to results from two private engineering firms hired to provide modeling solutions.</p><p>Bend's Sewer Infrastructure Advisory Group was presented the results Thursday. The upgrades include a large gravity pipeline, a sewage pumping facility, and several pipe capacity upgrades in the northern part of the city. Assistant City Manager Jon Skidmore says in some areas, existing sewer pipes routinely approach overflow levels.</p> Fri, 18 Apr 2014 20:46:43 +0000 Desmond O'Boyle 12000 at http://klcc.org Three Major Upgrades Needed For Bend's Sewer System Bend Sewer System To Get Overhauled http://klcc.org/post/bend-sewer-system-get-overhauled <p>The city of Bend is currently in the planning stages for a new sewer system. This new infrastructure is being set up with help from the community.</p> Mon, 18 Nov 2013 18:35:16 +0000 Graham Sprague 3273 at http://klcc.org Bend Sewer System To Get Overhauled